True Zone
Thickness
INPUTS
Assumptions:
The dip of the bed is less than the dip of the wellbore.
Maximum dip or deviation is 90 deg.
Degrees of bed dip from horizontal =
Degrees of well deviation
from vertical =
Top of zone =
Bottom of zone =
RESULTS
True zone thickness =